Visit the WeatherExtreme Ltd. Website 09/09 09/10  

Showers

Showers
 
 
vicodin online | viagra online | Tramadol online
 

Archive for November, 2009



First Flying Surfaces Underway

Monday, November 16th, 2009

The mold-building process has begun on the horizontal tailplane. No pictures as yet – hopefully we will have some photos to share soon.

This is the first of the “flying” aerodynamic parts to be started. It is proceeding in exactly the same way as the fuselage. First we cut a foam block with the CNC machine, then sand and paint it to make a plug. The mold is laid up on the plug, using high-temperature carbon fibre and resin. The actual parts will be laid up in the mold with lightweight pre-preg carbon fibre cloth.

Glider Graphic - Document End